Book a Demo

Ep. 69 | TEST CONFIGURATIONS 101(1 BICSI CEC)

Facebook
Twitter
LinkedIn

Properly configuring test equipment prior to testing is paramount for successful testing. This includes setting the correct test parameters, using the appropriate test adapters, and ensuring a secure connection to the cable under test.

Watch OnDemand and take Quiz to EARN 1 BICSI CEC as AEM covers the essentials of configuring and connecting your test equipment across a variety of testing scenarios:

🔸 Test configuration basics for Channel/Permanent Link/MPTL
🔸 Fiber Certification Loss Test (including set reference cord configuration)
🔸 OTDR, PoE testing, SNR (Signal-to-Noise Ratio) testing
🔸 Network discovery/troubleshooting
🔸 In-Line testing of an active link while end-point device is operational

Other Articles

Scheduled maintenance will take place on January 18, 2025, at 12:00 AM EST, which may cause brief downtime. We apologize for any inconvenience and appreciate your understanding.